Finished Edward Jones office suite with wood-look flooring and a gray feature wall, after a Clifton Development Group build-out

Tenant improvement · Capital Region, NY

Tenant improvement contractor for Capital Region offices, shops and clinics.

Signing a lease, or turning a suite over for a new tenant? Start with a walkthrough and a measured plan of the space, then a line-item scope for the build-out.

Call (518) 900-3199 — talk through a suite or a lease with a builder.

Tenant improvements

A leased suite, built for the business moving in

A tenant improvement, often called a TI, fit-up or build-out, is the construction that turns a leased space into a working office, store or clinic for one tenant. It can be as light as paint, carpet and a few relocated outlets, or as heavy as taking a suite back to the slab and rebuilding it.

Clifton Development Group handles tenant improvement work across Albany and the Capital Region for tenants, landlords, property managers and brokers. One general contractor carries the scope from the first walkthrough through the final punch list and coordinates the trades in between.

Most TI projects are shaped by the lease and its work letter, which says which items belong to the landlord, such as base-building systems or a vanilla box shell, and which belong to the tenant. The TI allowance, where there is one, sets how much of the tenant scope the landlord funds.

Scope

What a tenant improvement scope can include

These are the parts of the work a TI scope usually covers. Each one is written into the estimate line by line for the space in question.

Demolition and make-safe

Removing the previous tenant’s partitions, ceilings, flooring and abandoned wiring, and capping what the new layout no longer needs.

Framing and demising

New offices, conference rooms, exam rooms and storage, plus demising walls between suites when a space is split or merged.

Ceilings and lighting

Ceiling grid and tile, drywall ceilings and soffits, and lighting laid out for how each room will actually be used.

Power, data and low voltage

Circuits for workstations and equipment, dedicated power where a use needs it, and pathways for data, security and access control.

HVAC adjustments

Relocated or added diffusers and returns, rebalancing for a new layout, and coordination with the building’s system and its service contractor.

Plumbing

Restrooms, break rooms, coffee stations and exam-room or salon sinks, tied into the building’s existing lines.

Accessibility items

Accessible restrooms, door hardware, clearances and routes that a change in layout or use can bring into the scope.

Doors, millwork and casework

Interior doors and frames, reception counters, built-in storage and cabinetry.

Flooring and finishes

Carpet tile, resilient flooring, base, paint and wall protection, chosen to suit the use and the lease term.

Furniture and IT equipment usually sit outside the construction scope.

Floor plans, Matterport and as-builts

Measured before it is priced, documented after it is built

Many tenant improvement problems trace back to a floor plan that does not match the suite. Walls move between tenants, and the drawing in the broker’s package is rarely what stands there today.

For a TI that Clifton is pricing, the suite is scanned with a Matterport camera and drawn as a measured existing-condition floor plan before the layout is settled. The tenant, the landlord and any designer work from the same accurate plan. These are measured existing-condition drawings, not stamped design drawings; where an architect or engineer is needed, the plan gives them an accurate starting point. More on how the scans work is on the 3D scans and measured drawings page.

When the build-out is finished, as-built drawings and a scan of the completed suite can give the tenant and the landlord a record of what was built, which helps at the next renewal, refresh or turnover.

Landlords and tenants

Landlord work, tenant work and occupied buildings

Landlords often need a vacant suite brought to a lease-ready condition and a price for the tenant’s layout at the same time. Clifton can scope the landlord vanilla box work and the tenant’s fit-up separately, so the work letter, the allowance and the estimate line up.

Tenants can walk a space with a builder before signing and go into the lease conversation knowing what the layout involves.

Many TI projects happen in buildings that stay open, so noisy work and shared-system shutdowns are planned with building management. Larger office fit-outs are covered in more detail on the office renovation page.

Project example
Edward Jones office suite mid-build-out, with a Matterport camera on a tripod in the open suite — Clifton Development Group

Edward Jones office build-out

Tenant fit-up · financial services office

Clifton took a gutted suite for an Edward Jones office through rough plumbing, ceilings, lighting and finishes to a finished office with wood-look flooring and a gray feature wall.

A Matterport camera captured the suite mid-construction, as in the photo, and the finished space was scanned as well.

See more past commercial clients
Service areas

Tenant improvement contractor by town

Each town page covers the local building stock, landlord patterns and the fit-up scopes that come up most.

FAQ

Tenant improvement questions

What is a tenant improvement?

A tenant improvement is construction inside a leased space that adapts it to one tenant: walls, doors, ceilings, lighting, power and data, plumbing, and finishes. It sits between the landlord’s base-building work and the tenant’s furniture and equipment.

Who pays for tenant improvements, the landlord or the tenant?

The lease decides. Many leases include a TI allowance from the landlord and a work letter that lists which items are landlord work and which are tenant work. Clifton can price the two scopes separately so each side sees its own numbers.

How is a tenant improvement priced?

From a walkthrough, a measured plan of the suite and the tenant’s layout. The estimate is written line by line against that scope, so it is clear what is in, what is out and what depends on decisions still open.

Can the work happen while the rest of the building stays open?

Yes. Noisy work, system shutdowns, deliveries and debris removal can be scheduled with building management around the other tenants, and the work area can be separated from occupied space.

What is the difference between a vanilla box and a tenant improvement?

A vanilla box is landlord work that brings a vacant suite to a basic, lease-ready shell. A tenant improvement builds one tenant’s layout and finishes, often on top of that shell.

Why scan the suite before pricing it?

Old drawings rarely match the space. A Matterport scan and measured existing-condition floor plans show the real walls, ceiling heights and openings, so the layout and the estimate start from the suite as it is.

Request an estimate

Tell Clifton about the suite.

Share the address, the rough size of the space and where the lease stands. A builder walks the suite and writes a line-item scope for the build-out.

  • Walkthrough and measured plan of the suite
  • Written, line-item scope and pricing
  • Work planned around the building and the lease

Mon–Fri 8AM–5PM · Sat by appointment.