Clifton Development Group

Bathroom renovation project by Clifton Development Group — before and after

Bathroom Remodel Albany NY

Free 3D scan with every estimate

Bathroom remodeling across Albany and the Capital Region.

Tile showers, tub-to-shower conversions, accessible walk-ins, and full gut renovations. One crew handles demo through finish — demo, waterproofing, plumbing, tile, fixtures — so there is no handoff between trades and nobody to blame when something goes wrong.

Itemised written pricing, not a “starting at” range
Mon–Fri 8AM–5PM · Sat by appointment

Completed bathroom renovation in Albany NY by Clifton Development Group
5.069 Google reviews
2–3Weeks typical
500+Projects completed
NYLicensed & insured
Capital Region ranges, 2026

What a bathroom remodel costs here

We give itemised written pricing after seeing the room. These ranges are so you can sanity-check a budget first.

Powder room
$8K–$15K

Half bath. Vanity, toilet, floor tile, lighting, paint. No shower or tub work.

Hall bath — full gut
$18K–$32K

To the studs. New waterproofing, tile shower or tub surround, vanity, fixtures, floor.

Primary bathroom
$30K–$60K

Larger footprint, double vanity, frameless glass, heated floor, custom tile work.

Accessible conversion
$25K–$45K

Curbless entry, blocking for grab bars, wider door, roll-in or low-threshold shower.

Ranges reflect Albany-area labour and material costs. Moving plumbing, structural repair from prior leaks, and long-lead tile all push the upper end. Relocating a toilet drain is the single biggest cost jump in a bathroom.

What is behind the tile

The part you will never see is the part that matters.

Every failed tile shower we get called to fix failed for the same reason: water got behind the tile and had nowhere to go. Tile is not waterproof. Grout is not waterproof. The assembly behind them is what keeps water out of your floor joists.

Ask any contractor quoting your bathroom what their shower build-up is. If the answer is “cement board and a coat of something,” keep calling.

How we build a shower

  1. Framing checked and corrected. Studs plumb, blocking added where fixtures and future grab bars will land.
  2. Sloped substrate. Pre-sloped pan or mud bed pitched correctly to the drain — no ponding.
  3. Bonded waterproof membrane. Continuous across walls, floor, curb, and up over the corners. Seams and pipe penetrations sealed with matching band and collars.
  4. Flood test before tile. The pan gets filled and held. If it does not hold, we find out now rather than eighteen months from now.
  5. Tile set on the membrane. Full mortar coverage, especially at the corners and the shelf.
  6. Movement joints and sealed changes of plane. Corners get flexible sealant, not grout. Grout in a corner cracks — always.
Services

What we do

Every phase in-house — demo, waterproofing, tile, plumbing, fixtures, vanity, lighting, and finish. One crew, one contract, no handoff surprises.

Tub-to-shower conversion

Removing an unused tub for a full walk-in tile shower. The most requested job we do, and usually the biggest single improvement to how a bathroom actually gets used.

Most popular

Custom tile showers

Niches, benches, curbless entries, and full-height tile. Layout dry-set and confirmed with you before anything is permanently fixed.

Full gut-to-stud remodels

Everything out, everything new — including whatever the last renovation hid behind the walls.

2–3 weeks

Freestanding & alcove tub work

Soaking tubs, alcove replacements, and tub surrounds. Freestanding tubs need floor support and drain relocation checked first.

Vanity, fixtures & glass

Single and double vanities, mirrors, faucets, and frameless shower glass measured after tile rather than before.

Heated floors & ventilation

Electric radiant under tile, and exhaust sized to the room and ducted outside — not into the attic, which is where a surprising number of them end up.

Aging in place

Accessible and walk-in conversions

A lot of our bathroom work is people making a house work for another twenty years rather than moving.

Curbless and low-threshold showers. A roll-in or zero-step entry needs the floor structure assessed first — the drain has to sit below the finished floor, which sometimes means working between joists.

Grab bar blocking. The cheapest thing you will ever do is add solid blocking behind the tile while the walls are open. Bars can go in now or in ten years, but the blocking has to happen during the remodel.

Door width and turning space. Widening the door is often the difference between a bathroom a walker fits through and one it does not.

Comfort-height fixtures and lever handles. Small specification choices, no extra labour, meaningful difference in daily use.

If you are planning ahead rather than reacting to a change, tell us at the estimate. Building it in costs far less than retrofitting later.

Accessible bathroom remodel with curbless shower in the Capital Region NY
How we run a bathroom

Four steps, written scope before anything starts

No verbal estimates that change mid-tile.

STEP 01

Free in-home estimate

We measure, look at what is behind the current fixtures where we can, and discuss layout and tile. You leave with itemised written pricing.

STEP 02

Design and free 3D floor plan

We scan your existing bathroom with a Matterport camera at no charge, so you can see the new layout before demo starts and pick tile and fixtures against a real visual reference.

Free 3D scan with every estimate →
STEP 03

Structured renovation

Demo, waterproofing, plumbing, tile, fixtures — sequenced so the room comes back online as fast as possible. Daily updates throughout.

2–3 weeks typical
STEP 04

Final walkthrough

Joint walkthrough before we call it complete. Punch list items resolved within 5 business days of the walkthrough.

Recent work

Bathrooms around the Capital Region

Before and after pairs — it is the only honest way to show bathroom work.

BeforeBathroom before tub-to-shower conversion Capital Region NY
AfterFinished tile shower after tub-to-shower conversion by Clifton Development Group

Tub-to-shower conversion · Capital Region, NY · 3 weeks

BeforeBathroom before full gut remodel Albany NY
AfterCompleted bathroom renovation Albany NY by Clifton Development Group

Full gut remodel · Capital Region, NY · 2 weeks

Common questions

Before you call

How long will we be without the bathroom?

Two to three weeks for most full remodels. The room is genuinely out of service for nearly all of that — there is no partial-use stage in a bathroom the way there is in a kitchen.

If it is your only bathroom, tell us before we schedule. We can compress the critical path and stage material deliveries so the down time is as short as possible, but we would rather plan for it than surprise you.

We only have one bathroom. Is that a problem?

It is manageable but it needs planning. We sequence differently, order everything before demo so nothing stalls waiting on a vanity, and work consecutive days rather than spreading the job out.

Some clients arrange to stay elsewhere for the tile and plumbing stretch, which is the tightest part.

What warranty comes with the tile and waterproofing?

Punch list items are resolved within 5 business days of the walkthrough. Ask us directly about workmanship warranty terms on the shower assembly, and get the answer in writing — from us or from anyone else you are considering.

Do we need a permit?

Usually yes if plumbing is being moved or electrical is being added or relocated. A like-for-like fixture swap in the same location often does not. We pull whatever is required and schedule the inspections.

Can you move the toilet or shower to a different wall?

Usually, but relocating a toilet drain is the biggest single cost jump in a bathroom — it means opening the floor and re-running waste line with correct fall. On a slab or over a finished ceiling, that gets expensive fast.

Moving a sink or shower drain is generally easier. We will tell you what each move costs before you decide.

What if you find rot or old leaks behind the walls?

On older Capital Region housing stock this happens regularly, especially around tub surrounds and toilet flanges. We document it, show you, and price the repair before proceeding.

If the damage is significant it may be an insurance matter — see water damage restoration and our insurance claims page.

How far ahead should we order tile?

We finalise all selections before demo. Stock tile is quick; imported or specialty tile can run weeks, and a single back-ordered item can hold up an otherwise finished bathroom.

Order about ten percent extra. Dye lots vary between batches, and matching later is often impossible.

5.0 across 69 Google reviews

What clients say

★★★★★
Craig and his crew were great to deal with! Good communication and great work. Quick, efficient, and professional — I’d highly recommend them!
Timothy Jacques · Capital Region, NY · Home renovation
★★★★★
Connor was so helpful, kind and thorough! Cannot recommend their services enough, we will certainly be using them again!
Holly Jackman · Albany, NY · Remodeling
★★★★★
I chose Clifton Development Group after 2 other estimates and they did not disappoint! If you are looking for work done with precision and at a good price, certainly give them a call!
Dominic Spaulding · Capital Region, NY · Home remodel
Also worth knowing

Serving 30+ Capital Region towns

Albany, Clifton Park, Saratoga Springs, Halfmoon, Delmar, Troy, Schenectady, Loudonville, and more.

Serving 30+ Capital Region towns →

Bundling kitchen and bathroom

Scheduling both together reduces total downtime and can save on tile and fixture ordering, since you are buying from the same suppliers in one go.

See kitchen remodeling →

Free in-home estimate

Ready to start your bathroom?

Free in-home estimate, free 3D floor plan, and a written scope before any work starts. If you are getting other quotes, ask each of them what their shower waterproofing assembly is — the answer tells you most of what you need to know.

Mon–Fri 8AM–5PM · Sat by appointment

We respond within 24 hours. We do not share your details.